Cite Sportive Development

Rebuilding Beirut’s National Sports Stadium

 

The Cite Sportive Development lies in the heart of Lebanon's once troubled capital, straddling the ‘Green Line’ which marked the front line during the civil war. The original stadium was so heavily damaged, the government commissioned a new national stadium built on the site.

 

mainstad1.gif (21802 bytes)
The Main Stadium, during roof construction

mainstad7.gif (18244 bytes)
The Main Stadium, after completion

Stade Principal (Main Stadium)

The new National Stadium provides seating for 50,000 spectators along with extensive underground parking, offices, meeting rooms, athletes changing and warm up areas. Extensive service tunnels send many miles of cabling to TV and Radio commentary areas and to the vast display screen and score board. There is also a separate VIP area incorporating reception rooms and private road access where the seating is covered by a cantilevered structural steel roof.

Kvaerner Technology was appointed as a technical consultant for Kvaerner Construction International Limited to oversee all structural design aspects of the project. Completing this work to a tight schedule enabled Lebanon to hold the Pan Arab Games in the stadium in Mid July 1997.

 

mainstad4.gif (34666 bytes)
The Main Stadium, areal view

mainstad6.gif (12355 bytes)
The Main Stadium, north elevation


mainstad2.gif (23868 bytes)
The Main Stadium, during construction


mainstad5.gif (20697 bytes)
Floodlight, Main Stadium


mainstad3.gif (27149 bytes)
Under the stands, Main Stadium

sallep1.gif (23261 bytes)
Salle Polyvalente, view looking across the playing surface

sallep2.gif (24619 bytes)
Salle Polyvalente, from the main stadium

Salle Polyvalente

The new Salle Polyvalente provides seating for 5,000 spectators and comprises an inner and outer structure, and the original roof, which was kept as an architectural feature.

Kvaerner Technology was appointed structural designer for the project and, at the client’s request, carried out the design both in the office in London and on site in Beirut.

The high seismicity of the area, and the need for the inner structure to be free from shear walls, required the design to use state of the art thinking on the design of concrete sway frames in seismic areas. Coupling these difficulties with the separate roof structure and steel outer structure as well as a tight programme made for a technically diverse and challenging project.

 

sallep3.gif (18496 bytes)
Salle Polyvalente, with the main stadium in the background

sallep4.gif (14859 bytes)
Salle Polyvalente, the existing roof structure was to be kept

Client: Ministere De L’Education Nationale du Liban (Lebannese Government)
Architect: Laceco
Contractor: Kvaerner Construction International Limited
Design Consultant: Kvaerner Technology