Queen Elizabeth Hospital, Woolwich, London: I manage the team
undertaking the design of a new 40,000m2, 3 storey ward block, a new 3000m2
Mortuary and Pathology unit and a new Medical Records and Sterilization Unit.
Swimming pool complex,
North Aston, Oxfordshire: Addition of a new wing to an existing 18th
century Jacobethan Mansion. Overall project design responsibility, including design
concepts, coordination with client, architect, services engineers and contractor working
to very tight programme
Sports City Project, Beirut, Lebanon: This
project involved the design of a new 50,000 seat national stadium and 5,000 seat arena. I
was responsible for design and design coordination of the arena, as well as technical
review of specialist sub-consultants designs.
Piling gantry, Dahej, India: structural assessment of a 100m long steel
piling gantry. This required the modeling of the structure, visiting the site for testing
and inspection, and presenting my recommendations for remedial measures to the client.
Second Tagus Crossing Project, Lisbon, Portugal:
I spent 9 months working on site in Lisbon as the Deputy Design Manager and QA Manager for
the design company. I was responsible for the coordination between the design team in
London and the construction management team in Lisbon. I was also responsible for site
designs and had to liaise between Trafalgar House Technology and the other design teams in
Lisbon, Paris and Lyon.
A12 - M11 Link Road, Hackney, London: Responsible for a 6 man design
team working on the design of temporary bridges to a very tight programme.
Aden Free Zone Port, Yemen: Preliminary design of a 700m long quay
wall.
Izmit crossing, Turkey: Conceptual design of the main pier foundations
in 50m deep water.
Norra L�nken ring road, Stockholm, Sweden: Team leader responsible for
the preliminary design of cut and cover tunnels, bridges and other associated structures.